Problem
A rehabilitation facility for people with brain and spinal cord injuries needed a seamless floor & wall solution for the restrooms in their facility. Traditional tile floors and walls create an environment that harbors microbial growth and mold as the joints begin to break down and degrade.
Solution
DUREX provided a troweled in place integral floor and wall epoxy mortar system. The floor and wall are troweled in place seamlessly so that no joints, grout lines, or terminations exist to create a place for mold and grime to grow.