Sports Complex and Hotel Lancaster, PA Problem: The owner’s design team picked a very high end marble tile for the entry lobby of the new hotel. The tile shipped from over-seas and after a 16 week lead time, the tile arrived with manufacturing defects. The entire lot of tile was unusable. The hotel was […]